Pasek/Jensen Waterline and Reconstruction

Location:

Oak Harbor, WA

Services Provided:

PS&E, Survey, Construction Staking, Civil Design

Pasek Street & Jensen Street Waterline Replacement & Reconstruction

Harmsen prepared a Plans Specs & Estimate (PS&E) package for the SE Pasek Street and SE Jensen Street Waterline Replacement and the Waterloo Road Waterline Installation Projects.  The project involved the following work items:

  • Replacement of waterline in SE Pasek Street from SE 8th Avenue north to E Whidbey Avenue and in SE 2nd Court from SE Pasek Street to its terminus.  As part of the pavement repairs, SE Pasek was repaved from SE 4th Avenue to E Whidbey Avenue
  • Replacement of waterline in SE Jensen Road from SE Pioneer Way to SE 8th Avenue; and the
  • Modification of the previously designed, private waterline construction documents to conform to City of Oak Harbor construction document standards for the public installation of a waterline in Waterloo Road from Highway 20 east to the existing waterline in Waterloo Road.    

Civil Design - Both City and WSDOT standards were adhered to. Harmsen performed preliminary and final engineering of:

  • 2,700 Lineal feet of water main in SE Pasek Street
  • 1,000 Lineal feet of road reconstruction in SE Pasek Street
  • 950 Lineal feet of water main in SE Jensen Street 810 Lineal feet of water main in Waterloo Road

Surveying Work Items Included

  • Surveying and base mapping
  • Topographic mapping
  • Construction staking
  • Record drawings