Pasek/Jensen Waterline and Reconstruction
Pasek Street & Jensen Street Waterline Replacement & Reconstruction
Harmsen prepared a Plans Specs & Estimate (PS&E) package for the SE Pasek Street and SE Jensen Street Waterline Replacement and the Waterloo Road Waterline Installation Projects. The project involved the following work items:
- Replacement of waterline in SE Pasek Street from SE 8th Avenue north to E Whidbey Avenue and in SE 2nd Court from SE Pasek Street to its terminus. As part of the pavement repairs, SE Pasek was repaved from SE 4th Avenue to E Whidbey Avenue
- Replacement of waterline in SE Jensen Road from SE Pioneer Way to SE 8th Avenue; and the
- Modification of the previously designed, private waterline construction documents to conform to City of Oak Harbor construction document standards for the public installation of a waterline in Waterloo Road from Highway 20 east to the existing waterline in Waterloo Road.
Civil Design - Both City and WSDOT standards were adhered to. Harmsen performed preliminary and final engineering of:
- 2,700 Lineal feet of water main in SE Pasek Street
- 1,000 Lineal feet of road reconstruction in SE Pasek Street
- 950 Lineal feet of water main in SE Jensen Street 810 Lineal feet of water main in Waterloo Road
Surveying Work Items Included
- Surveying and base mapping
- Topographic mapping
- Construction staking