Marysville Pilchuck High School Commons

Location:

Marysville School District, Marysville, Washington

Services Provided:

Topographic Survey, Civil Engineering

Because of the shooting which took place in the cafeteria at Marysville Pilchuck HighSchool in October 2014, the Marysville School District undertook a project to build a new facility and demolish the existing cafeteria.  The District hired Harmsen to perform a topographic survey at the area of demolition and for the facility design on a new site.  Architect Hutteball & Oremus then hired Harmsen to do the civil engineering for the project.

The new cafeteria was placed to the east of the existing gym. The project utilized a pervious concrete patio, a new water main loop around the building, and a sewer forcemain to the existing gravity system.  Harmsen engineering provided design development services, construction documents, participation in bidding and negotiations, value engineering, and construction administration for the project.  Construction was completed in 2016.

No items found.